↗Yieldline

Taman Maluri, Kuala Lumpur · project analysis

M Vertica investment analysis

The investment case tests whether strong rail and retail access can offset the project’s very large internal supply, and compares its 3- and 4-bedroom layouts with nearby Maluri and Cheras asking rents.

Open the live M Vertica report →
DeveloperMah Sing Group Berhad
TenureLeasehold
Project supply3,600 serviced apartments
StatusCompleted in 2023

ACCESS & TENANT DEMAND

What may bring tenants here?

The official brochure states a 500-metre covered walkway to the operating Maluri MRT-LRT interchange. Yieldline separates that project claim from measured station and walking evidence.

WHAT THE REPORT CHECKS

  • Rent evidence for the same bedroom and bathroom count
  • Required rent for target yields and monthly cash flow
  • Likely student, professional, international or local tenant markets
  • Nearby homes competing for the same renter
  • Transit use, useful destinations and verified walking evidence where available

LAYOUT BEFORE BUILDING

Do not give every unit the same investment score.

A studio, two-bedroom and dual-key home can serve different tenants even when they share one address. Yieldline evaluates each layout separately.

Evidence boundary: asking rent is not signed rent, a disappeared listing does not prove it was rented, and a nearby station does not by itself prove tenant demand.

Project facts last reviewed 2 August 2026. Primary project source: Official Mah Sing project page.

See layouts and nearby rent evidence →